Miami-Dade 2040 LRTP - Oct. 23, 2014
Appendices EYES ON THE FUTURE | G-19 This project would providing additional capacity or TSM&O improvement along the Turnpike (SR-821) from SR-874 (Don Schula) to Killian Parkway to alleviate future congestion and accommodate continued growth in traffic demand. Project Limits From Limits To Description Purpose and Needs Statement SR-821 (HEFT) SR-874 (Don Shula) Killian Pkwy Widen to 10 lanes SR-821 (HEFT) NW 57 Ave (Red) Turnpike (Mainline) This project would construct two additonal travel lanes in each direction along a section of the Turnpike (SR-821), increasing capacity from 6-lanes to 8-lanes. This project will be an important part of capacity improvements to the full length of the Turnpike (SR-821), urgently needed in response to existing congestion and anticipated continued growth in traffic demand. The project to widening this section of the southern Turnpike (SR-821) from 4-lanes to 6-lanes is included in the Tentative Work Program. SR-821 (HEFT) I-75 NW 57 St (Red) Widen to 8 lanes This project would construct two additional travel lanes in each direction along a section of the Turnpike (SR-821), increasing capacity from 4-lanes to 6-lanes. This project will be an important part of capacity improvements to the full length of the Turnpike (SR-821), urgently needed in response to existing congestion and anticipated continued growth in traffic demand. SR-826 (Palmetto) NW 103 St NW 154 St Widen with express lanes Evaluate the corridor for operational and capacity improvments including interchanges. SR-826 (Palmetto) SR-836 (Dolphin) NW 103 St Add 4 special use lanes This project will construct special use lanes on SR-826 (Palmetto) from SR-836 (Dolphin) to I-75, providing needed mobility improvements and mobility options for users of SR-826 (Palmetto). Widen to 8 lanes MIAMI-DADE LONG RANGE TRANSPORTATION PLAN UPDATE TO THE YEAR 2040
RkJQdWJsaXNoZXIy MzYyODQ=