Miami-Dade 2040 LRTP - Oct. 23, 2014

Appendices EYES ON THE FUTURE | G-15 This project will widen SW 72 St from SW 157 Ave to SW 117 Ave from 4 to 6 lanes providing needed mobility improvements on SW 72 St. Project Limits From Limits To Description Purpose and Needs Statement SW 162 Ave (Farm Life) SW 312 (Campbell) SW 328 (Lucy) Add 2 lanes and center turn lane and reconstruct This project will add to lanes to SW 162 Ave from Lucy Street to approximately SW 328 St to complete the widening that has already occurred south of SW 328 St, providing needed mobility improvements on this facility. The improvement is also needed to address substandard roadway conditions and add sidewalks and curb and gutter to improve pedestrian safety issues. SW 24 St SW 117 Ave SW 107 Ave Add 2 lanes and reconstruct This project will widen SW 24 St from SW 117 Ave to SW 107 Ave to 6 lanes, providing needed mobility improvements on SW 24 St. SW 320 St (Mowry) SW 187 Ave S. Dixie Hwy SW 197 Ave SW 142 Ave Add 2 lanes and reconstruct This project will widen SW 320 St from SW 197 Ave to SW 187 Ave and from S Dixie Highway to SW 142 Ave to 4 lanes, providing needed mobility improvements on SW 320 St. SW 72 St SW 117 Ave SW 157 Ave Add 2 lanes and reconstruct Turnpike (Mainline) SR-821 (HEFT) Widen to 8 lanes This project would add travel lanes to the Turnpike (Mainline Spur). This project will widen the exisiting facility from 6-lanes to 8-lanes and is urgently needed in response to exisiting congesition and anticipated conitinued growth in traffic demand. Turnpike (Mainline) Golden Glades Interchange Add SB ramp capacity This project includes improvements to the Turnpike Southbound to I-95 Southbound movement within the Golden Glades Interchange with a direct connect flyover from the Turnpike to 95 Express. This improves overall regional mobility with the improvement of the operation of the connections among all of the major facilities: the Turnpike, I-95, and the SR-826 (Palmetto). Golden Glades Interchange MIAMI-DADE LONG RANGE TRANSPORTATION PLAN UPDATE TO THE YEAR 2040

RkJQdWJsaXNoZXIy MzYyODQ=