Miami-Dade 2040 LRTP - Oct. 23, 2014

G-12| MOBILITY OPTIONS Project Limits From Limits To Description Purpose and Needs Statement NW 72 Ave (Milam Dairy) NW 122 St NW 138 St Add center turn lane This project will widen NW 72 Ave from NW 122 St to NW 138 St to 3 lanes, providing needed mobility improvements on NW 72 Ave. NW 72 Ave (Milam Dairy) Operatonal improvements Palmetto Intermodal Terminal SR-826 (Palmetto) and NW 74 St Intermodal facility to service cruise terminals This is a needed low cost freight operational improvement, identified in the Freight Plan Update, that may not require PD&E, and may be able to go directly to design. Improve quality, safety, convenience, comfort and accessibility. Serve new markets and increase system integration. Enhance regional connectivity. Support Express Bus Network. Ramps between the US-1 Busway and SR-826 (Palmetto) US-1 Busway SR-826 (Palmetto) Construct ramps connecting the US-1 Busway to SR-826 (Palmetto) Improve quality, safety, convenience, comfort and accessibility. Serve new markets and increase system integration. Enhance regional connectivity. Support Express Bus Network. SR-821 (HEFT) SW 137 Ave SW 216 St Widen to 8 Lanes. Needs by 2030. Express lanes will be included for portions of project length. This project would add two travel lanes in each direction to a six-mile section of the southern Turnpike, increasing capacity from 6-lanes to 8-lanes. This project will be an important part of capacity improvements to the full length of the Turnpike (SR-821), urgently needed in response to existing congestion and anticipated continued growth in traffic demand. The project to widening this section of the southern Turnpike (SR-821) from 4-lanes to 6-lanes including express lanes is included in the Tentative Work Program. SR-821 (HEFT) SW 312 (Campbell Dr) Widen to 6 lanes This project would add one travel lane in each direction to a three-mile section of the southern Turnpike (SR-821), increasing capacity from 4-lanes to 6-lanes. This project will be an important part of capacity improvements to the full length of the Turnpike (SR-821), urgently needed in response to existing congestion and anticipated continued growth in traffic demand. Hialeah Expy SW 288 St

RkJQdWJsaXNoZXIy MzYyODQ=