Miami-Dade 2040 LRTP - Oct. 23, 2014
Appendices MIAMI-DADE LONG RANGE TRANSPORTATION PLAN UPDATE TO THE YEAR 2040 EYES ON THE FUTURE | G-9 Project Limits From Limits To Description Purpose and Needs Statement SW 312 St (Campbell) SW 152 Ave SW 137 Ave Add 2 lanes with left turn lanes and reconstruct This project will add 2 lanes to Campbell Drive and provide turn lanes from SW 152 Ave to SW 162 Ave, providing needed mobility improvements to a roadway that is currently experiencing LOS F and is expected to get worse in the future. SW 320 St (Mowry) SW 197 Ave US-1 SW 187 Ave SW 142 Ave Add 2 lanes with left turn lanes and reconstruct This project will add continuous left turn lanes, providing needed mobility improvements on Mowry Drive. SW 8 St (Tamiami) Grade Separations SW 87 Ave SW 107 Ave Grade Separations at SW 8 St/ SW 87 Ave and SW 8 St/SW 107 Ave The purpose of the project is to improve overall traffic operations at the existing at-grade intersection of SR- 90/SW 8 St and SR-973/SW 87 Ave in order to alleviate conges on and achieve acceptable Levels of Service (LOS) in the existing and future condi on. SW 80 St SW 72 Ave US-1 Add 2 lanes and center turn lane and reconstruct This project will widen SW 80th Street from SW 72 Ave to S Dixie Highway to 5 lanes, providing needed mobility improvements on SW 80 St. Venetian Causeway Bridge Bayshore Dr Purdy Ave Bridge replacement This project will replace a bridge that is currently in a state of disrepair, providing a necessary safety improvement to a vital bridge connecting downtown Miami and Miami Beach. W Dixie Hwy NE 163 St NE 175 St Widen to 4 Lanes This project will widen W Dixie Highway from NE 163 St to NE 175 St to 4 lanes, providing needed mobility improvements on W Dixie Highway. Direct Ramps to Dolphin Station Intermodal Terminal SR-836 (Dolphin) Managed Lanes Dolphin Station Intermodal Terminal Direct access ramps Provide greater connectivity and convenience. Priority III
RkJQdWJsaXNoZXIy MzYyODQ=