Miami-Dade 2040 LRTP - Oct. 23, 2014
EYES ON THE FUTURE | G-5 Project Limits From Limits To Description Purpose and Needs Statement I-95 I-95 S Miami Ave Ramp reconstruction/reconfiguration of I-95 ramps in downtown Miami at S Miami Ave This project will realign the existing I-95 ramps that feed in to Downtown Miami. The proposed realignment will promote a more efficient use of Downtown streets while reconnecting Flagler St to the Miami River Area. Kendall Corridor (Kendall Enhanced Bus) West Kendall Transit Terminal Dadeland North Metrorail Station PTP Corridor Project. MDT Off-St Bus Stop Enhancements MDT Systemwide Incremental improvement on PTP corridor Enhance all off-street bus stops, include new bus shelters and passenger amenities Improve safety, access, comfort and convenience at local bus stops. Medley Bridge/Canal Improvement Program Improvements at; NW 121 Way, NW 116 Way, NW 105 Way, NW 79 Ave This project will improve freight mobility and includes operational improvements which provide access to the Okeechobee Road corridor. FDOT recently completed a PD&E study for Okeechobee which is a Strategic Intermodal System (SIS) corridor. The PD&E study also proposed improved access connections (crossing the Miami River canal) between NW South River Drive and Okeechobee Road. The project is needed to facilitate and enhance intermodal freight movement within the corridor, and access to regional employment centers, and freight activity centers. Medley Freight Access Roadway Improvements US-27 (Okeechobee) Bridge widening and canal improvements at NW 121 Way, NW 116 Way, NW 105 Way, and NW 79 Ave This project will provide streetlights and other local roadway infrastructure improvements in the Medley area. This project is needed to provide streetlights for night time operations which will improve safety. In addition, pavement conditions from heavy vehicles have deteriorated and the 1950s designed intersections can not safely accommodate larger standard trailers. Metrorail Park-and-Ride Facility At Dadeland South Park-and-ride facility with 1000 parking space garage and ground floor retail and office space Increase capacity, quality, accessibility, comfort and convenience. North Corridor (Biscayne) Enhanced Bus Miami Downtown Terminal Aventura Terminal Incremental improvement on PTP corridor Partially Funded PTP Corridor Project. Medley Appendices MIAMI-DADE LONG RANGE TRANSPORTATION PLAN UPDATE TO THE YEAR 2040
RkJQdWJsaXNoZXIy MzYyODQ=