Miami-Dade 2040 LRTP - Oct. 23, 2014
G-4| MOBILITY OPTIONS Project Limits From Limits To Description Purpose and Needs Statement Golden Glades Interchange: I-95 Biscayne River Canal Add 2 auxiliary lanes The primary purpose of this project is to provide an express lanes system-to-system connection for the SR- 826 (Palmetto) eastbound to I-95 northbound movement in order to increase connectivity, improve mobility and shorten travel delay caused by the circuitous routes in existence today at the Golden Glades Interchange (GGI). Golden Glades Interchange: I-95 SR 916/Opalocka Boulevard Golden Glades Interchange New road construction This project will construct an auxiliary lane between the US 441 loop on ramp and the SR-826 (Palmetto) loop off ramp on the northbound connector between I-95 and the Turnpike. This project is needed to relieve congestion and improve traffic flow and safety on NB I-95, the NB I-95 HOT lane egress at Golden Glades and the NB connector (I-95 to Turnpike). Golden Glades Interchange: SR-826 (Palmetto) NW 17 Ave Managed lanes The primary purpose of this project is to provide an express lanes system-to-system connection for the SR- 826 (Palmetto) eastbound to I-95 northbound movement in order to increase connectivity, improve mobility and shorten travel delay caused by the circuitous routes in existence today at the Golden Glades Interchange (GGI). Golden Glades Interchange: SR-826 (Palmetto) At I-95 New express lane ramps on I-95 The primary purpose of this project is to provide an express lanes system-to-system connection for the SR- 826 (Palmetto) eastbound to I-95 northbound movement in order to increase connectivity, improve mobility and shorten travel delay caused by the circuitous routes in existence today at the Golden Glades Interchange (GGI). I-95 I-95 E 2 Ave Ramp reconstruction/ reconfiguration for the I-95 ramps leading into downtown Miami at E 2 Ave This project will realign the existing I-95 ramps that feed in to Downtown Miami. The project will realign the existing ramps that inefficiently use Downtown streets. The reconfigured ramps will result in the Miami River being reconnected to the Flagler St Area. Miami Garden Dr Golden Glades Interchange
RkJQdWJsaXNoZXIy MzYyODQ=