Miami-Dade 2040 LRTP - Oct. 23, 2014

Table 6-6 | Priority I Projects (continued) (Values in Millions YOE $) Project Limits From Limits To Descrip on 85 NW 142 St NW 102 Ave NW 97 Ave NW 138 St NW 107 Ave NW 145 Place New 2 lane divided road Widen 1 additional lane $7,781 86 SR 25 (Okeechobee) W of NW 138 St East of NW 107 Ave Operational/capacity improvements with grade separated intersections $35,050 Bolded phase funds are included in the 2015/2019 Miami-Dade TIP * denotes portions of phase values are included in both the TIP and 2040 Plan MOBILITY OPTIONS Total Capital Cost Funded via TIP Total Capital Cost (2013 $) Project Costs Funded via 2040 Plan MAP ID Table 6-6 | Priority I Projects (continued) (Values in Millions YOE $) Project Limits From Limits To Descrip on 57 SW 137 Ave US-1 SW 200 St Completion as 2 continuous lanes $13.934 58 SW 137 Ave SR-821 (HEFT) US-1 Add 2 lanes and reconstruct $6.949 59 W 147 Ave/SW 8 St Park-and-Ride** Park-and- Ride facility $9.000 60 SW 152 St SW 157 Ave SW 147 Ave Add 2 lanes and reconstruct $2.351 61 SW 157 Ave SW 184 St (Eureka) SW 152 St (Coral Reef) New 4 lane road construction $6.662 62 SW 27 Ave US-1 Bayshore Dr Add center turn lane $1.347 63 Add 2 lanes and center turn lane and reconstruct SW 312 St (Campbell) SW 187 Ave SW 177 Ave $5.723 64 SW 312 St (Campbell) SR-997 (Krome) US-1 Widening existing lanes and reconstruct $13.181 65 SW 320 St (Mowry) SW 187 Ave Flagler Ave Add 2 lanes and reconstruct $1.805 66 SW 328 St US-1 SW 162 Ave Add 2 lanes and reconstruct $2.146 67 SW 336 St SR-997 (Krome) US-1 Widen and resurface existing roadway $1.390 68 SW 344 St (Palm) SR-997 (Krome) US-1 Widen and resurface existing roadway $0.890 69 West Ave Connector Bridge North of Lincoln Rd South of 18 St New bridge construction $ 5.473 70 SR-968/SW 1 St At Miami Bridge replacement $ 84.981 Bolded phase funds are included in the 2015/2019 Miami-Dade TIP * denotes portions of phase values are included in both the TIP and 2040 Plan MOBILITY OPTIONS Total Capital Cost Funded via TIP Total Capital Cost (2013 $) Project Costs Funded via 2040 Plan MAP ID 71 NW 89 Ave NW 93 St NW 95 St Widen to 3 lanes $ 1.813 72 NW 93 St NW 89 Ave NW 87 Ave Widen to 3 lanes $ 1.813 73 NE 151 St Biscayne Blvd Bay Vista Blvd Widen to 6 lanes 74 SR 836 (Dolphin) SR 836 (Dolphin) SR 821 (HEFT) New HEFT Ramp Connections $ 24.400 75 SR 874 (Don Shula)/SW 72 St Add new interchange $ 9.700 6-14A | MOBILITY OPTIONS 87 88 89 SR 821(HEFT) NW 107th Ave SR 25 (Okeechobee) NW 1 0 St NW 170th St Interchange SR 821 (HEFT) W of SR 821 (HEFT) W of NW 138 St Construct New Diverging Diamond Interch ge at th SR 821(HEFT) and NW 170th St Improve Access to NW 107th Ave at NW 170th St Interchange on SR 821 (HEFT) Widen SR 25 (Okeechobee) Rd $44.400 $15.900 $10.500 90 Franjo Rd Old Cutler Rd SW 184 St Widen from 2 to 3 lanes $8.947

RkJQdWJsaXNoZXIy MzYyODQ=